Operating Portfolio
To date we have developed, constructed and commissioned 12 solar power plants with a total capacity of approximately 80 MWp. This has involved use of 280 000 solar panels, more than 300 km metallic structures, 45 km of roads constructed or improved. Our current operating plants reduce CO2 emissions by more than 70 000 tons per annum. All of the plants have been constructed according to highest industry standards.
СОНЯЧНА ЕЛЕКТРОСТАНЦІЯ, С. ПОРОГИ
The non-technical summary of the project can be downloaded here:
The stakeholder engagement plan of the project can be downloaded here:
СОНЯЧНА ЕЛЕКТРОСТАНЦІЯ, С. ГНАТКІВ
The non-technical summary of the project can be downloaded here:
The stakeholder engagement plan of the project can be downloaded here:
GLIBOCHOK SOLAR II, PHASE II
СОНЯЧНА ЕЛЕКТРОСТАНЦІЯ, 2-й ЕТАП, М.ШАРГОРОД
The non-technical summary of the project can be downloaded here:
The stakeholder engagement plan of the project can be downloaded here:
СОЛНЕЧНАЯ ЭЛЕКТРОСТАНЦИЯ, ПОРОГИ 2-ЭТАП (С.РЫКОВО)
The non-technical summary of the project can be downloaded here:
The stakeholder engagement plan of the project can be downloaded here:
СОНЯЧНА ЕЛЕКТРОСТАНЦІЯ, С.АФАНАСІЇВКА
The non-technical summary of the project can be downloaded here:
The stakeholder engagement plan of the project can be downloaded here:
СОНЯЧНА ЕЛЕКТРОСТАНЦІЯ, С.ТАБОРІВКА
The non-technical summary of the project can be downloaded here:
The stakeholder engagement plan of the project can be downloaded here:
СОНЯЧНА ЕЛЕКТРОСТАНЦІЯ, С.ТОКАРІВКА
The non-technical summary of the project can be downloaded here:
The stakeholder engagement plan of the project can be downloaded here: